Line 5

October 2013 update

Line 5 - Limestone Crusher Commissioning
Kiln commissioning First Rotation
RAWMILL- SEPARATOR FAN WITH DRIVE MOTOR
PREHEATER WITH SLIDE CLADDING
PRE HEATER TOP CYCLONES BEING INSULATED
INCLINED CLINKER PAN CONVEYOR
CLINKER SILO TOP PIVOT CONVEYOR
RM-1 MAIN DUST PLANT DIFFUSER WITH CONNECION DUCT INSTALLED
RM-2 100% GAS DUCTS COMPLETED AND RM-1 DUCTS ERECTION ON GOING
RM-1 SEPARATOR OUTLET DUCT BEING LIFTED TO POSITION
KILN BURNER PLATFORM BEING CLADDED
MAIN BURNER FINE COAL SYSTEM BEEN COVERED
KILN FEED SYSTEM TOP AIRSLIDE CONNECTION TO 1ST CYCLONE AT PRE HEATER
COOLER CLINKER BREAKER PROTECTIVE CHAIN CURTAIN