Line November 2012 update

4 major cranes in operation
Calciner parts lifted
Kiln full length assembled. Welding to be completed before end 2012
Kiln last shell going to the position
Kiln support
Pre-calciner vertical shaft
Kiln fan
Fan casing pre-assembled
Rawmill bag filter erection in progress
Cooler grates in position
Cooler Fans
Cooler Heat Exchanger frame